2011年10月12日星期三

UGG Boot NZC B110157-2 Ningxia rock art research center housing maintenance office Tender Notice Ten

Posted :2011-08-17
NZC/B110157-2 rock art research center Ningxia Hui Autonomous Region office room service tenders marked Tender Notice Information text: Ningxia rock art research center housing maintenance office procurement plan tender Tender Notice No.: 2011NCZ0480 procurement document number: NZC/B110157-2 procurement agencies: Ningxia Hui Autonomous Region Rock Art Research Center Contact: Liu Hui Tel :0951 -5059892 bidding agencies: Ningxia Government Procurement Centre Address: 86 North Street, Yinchuan, Ningxia, No. enrollment into contact Ning : Liu Yang Tel :0951-5033931 Email: nx5033931@163.com opening contact: Ma Zhenjun sand Fei Tel :0951-5053445, 5051130 Email: nx5053445@163.com Letter of release Contact: Ma Yunyan Tel :0951 -6,084,226 Email: fdd2002@126.com announcement media: China Government Procurement Network (www.ccgp.gov.cn); China Ningxia bidding and government procurement network (www.zbj.gov.cn) contents of the tender: No. Item technical requirements 1 Ningxia Rock Art Research Center, an office room maintenance projects, tenders: (a) waterproofing and insulation projects: 1, waterproof layer of roof insulation area: 500; 2, to eradicate the old waterproof layer (500), roof and caulking cracks in clay construction with PVC, do the new layer of cement mortar, roof insulation board 10 thick polyvinyl chloride benzene, benzene, roof insulation board adhesive mortar, roofing cement mortar 5 thick roof thick SBS waterproofing membrane 40, trash transportation, etc.; 3, roofing materials for the national standard -18 degrees, 40 thick polyester sheet or gravel green tire SBS 40 SBS thick polyester tire reflective film waterproofing membrane, waterproofing materials; 4, all materials are one-time approach, material entering the certificate along with the product should pay the tender unit retained sample; 5, waterproofing and insulation construction must comply with the state promulgated the . 7, the project quality requirements: (1) construction of a qualified waterproofing membranes; (2) the use of SBS waterproofing membrane meets the design requirements and specification; (3) water base surface must be hard, flat, dry, clean, there should be anti- sand phenomenon, remove sharp objects; (4) Paving method and hot melt sheet bonding order compliance requirements; (5) details to enhance and received the first treatment must comply with the specification; (6) coil parts must be bonded seams solid, tight closure, there shall be no wrinkles, hollowing, Alice, delamination and other phenomena. (B) circuit reconstruction project: 1, because the original line aging, inadequate capacity, wires made of aluminum, can not meet current load requirements, the transformation, retain the original aluminum wire to be used to meet the lighting, the other to increase copper electrical wiring and outlets, stairways,UGG Online Outlet, corridors and increasing part of the replacement lamp lights,UGG Boot, switches are voice-activated, power distribution box into the wall (1); 2, Material Requirements: 10 copper thread (100M), 4 copper branch line (270M), 16A air-conditioning outlet (9), voice-activated switch, 5 cm main duct (100M), 3 cm branch trunking, etc. (270M), these materials should be regular factory production, materials need to be qualified products when entering card to pay the tender together with the sample unit. (C) the replacement of windows and doors project: 1, remove the brick wall is blocking the windows (6), install hollow steel windows (9), fill joints leveling paint; 2, Shide PVC profiles with steel requirements, insulating glass, garbage removal cleaning; 3, stairs to install security doors (200 × 120 anti-theft door one). 4, increase the roof turret stairs (ironwork welding). (D) Showcase (920CM × 75CM), stainless steel government affairs column (120CM × 240CM), magnetic wall paintings produced (250CM × 500CM) requests for production according to the tender. Second, the construction period: from the start date of 20 days. Third, project contracting in the form: package materials, including duration, including quality; four bidders: 1, the project's tender offer price using full cost method (the so-called full-cost means to complete the entire contents of the tender cost and duration , profit, taxes, start-up costs, technical measures for the construction costs, machinery into the appearance fees, risk charges, policy documents and all other fees prescribed fee. technical specifications, the cost should be included in the tender offer). Tender offer bidders in the tender documents for the proposed amount of the payment of the sum. Only total and no breakdown of the tender offer document is invalid; 2, the project's price range is the entire contents of BOQ, tender offer for the death of one package, accounts will no longer be adjusted. Bidders should make their own on the construction site and the surrounding environment survey, preparation of tender documents to obtain the required information and sign the contract. Site investigation costs incurred by the bidders themselves. Tender offer to bidders on the construction site information and data is tender bidders who make use of existing information. Tender for bidders to make the resulting inference is not responsible for understanding and conclusions. Bidders for their own reasons not yet reached the construction site field reconnaissance, and after the signing of the contract bid and performance process, bidders shall not be not fully understand the situation on the grounds, any form of increase in project cost or claim requirements; 3 bids should ensure that they provide information about the negotiations of the authenticity, validity and legitimacy, otherwise, any liability resulting from its own; 4, if the tender side deems it necessary, may require bidders to submit within the prescribed time additional information or tender documents evidence; 5, the bidder should deal before signing the contract to tender to submit a performance bond of 5% (period to be completed and passed inspection of construction). Note the total amount of tender should include material costs, labor costs, transportation costs, taxes and all other costs. Bidder qualification requirements: 1, signed by legal representative of the special power of attorney and authorized agent ID card. (Original) 2, bidder business license. (Copy of a copy of the official seal) 3, tax registration certificate (National and Local). (Photocopy with official seal) 4 organization code certificate. (Copy of a copy of the official seal) 5, Social Security funds to pay records. (Copy) 6, the prosecution issued nearly three years without criminal records bribery written this letter. (Copy) 7, the bidder must have experience in building waterproof insulation construction. (Copy of Certificate with official seal) 8, the bidder must have the safety production license. (Copy stamped with official seal) 9, the last three years had a similar scale construction performance (on-site bidders are required to provide notice of the original contract or bid) 10, appointed the project leader must have experience of similar construction, management support and a with the appropriate qualifications and experience of the project, must ensure that all technical certificates (photocopy); 11, and other documents related to this project. Evaluation methods: method to obtain the lowest evaluated bid price of tender documents: Now until five working days before the opening date will not receive. 8:00-12:00 am and 2:30-6:00 pm each day Location: North Street, Yinchuan, Ningxia into 86 rather purchase one. (Ningxia Government Procurement Center, fourth floor) to obtain the tender papers: distributed free of charge, by mail to send receive (such as bidders bid to give up, need to tell me before opening the first three centers); foreign suppliers registration process: bidders units on full name, contacts, fixed telephone, mobile phone, email address, the reported project, project number, sub-Sections of tenders must be marked by fax to 0951-5033931. I receive a fax as an official registration center, paid by electronic mail the tender documents. Please remit the bid deposit: Account Name: Ningxia bidding Management Service Bank: CCB Culture West Branch Account number: 64001120900050005417 Application Supplier Information: official register bidders bid bond in the opening day of payment vouchers, the day I center Lina officers will not bid for unit bid bond refund, without waiting, please note, thank you! Opening time: at 8:30 on September 7, 2011 at Bid Opening Location: Ningxia Hui Autonomous Region bidding Trading Service (Yinchuan Yinchuan bright square blocks south of Park International Trade Center, fourth floor) Ningxia Government Procurement Center on August 17, 2011 Day
相关的主题文章:

没有评论:

发表评论